• Precautions for using bridge crane

    Precautions for using bridge crane

    13615481234

    Business nature: production-oriented

    Contact: Manager Wu

    Phone:0538-7431089

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more about product information

    Product Company Profile Location

    Information Details

      Bridge crane is a type of crane, which generally consists of several parts such as a bridge frame equipped with a large crane operating mechanism, a lifting trolley equipped with a lifting mechanism and a trolley operating mechanism, electrical equipment, and a driver's cab. It looks like a single span flat slab bridge supported at both ends on parallel overhead tracks, so it is called a bridge crane. What are the precautions when using a bridge crane? Let the Shandong bridge crane manufacturer introduce it to us.

    1. The driving must be in normal condition, especially the devices such as braking mechanisms, sound and light, signals, interlocking devices, etc. must be sensitive and intact.

    2. During the work process, the operator should concentrate and spin the crane before lifting. The lifted object should be lifted 100-150mms off the ground. If it is found that the lifted object is not tightly tied, it should be re tied. Before driving, the signal bell should be sounded first; Lifting objects must not pass over human heads. When the overhead crane is in operation, it is strictly prohibited to repair, inspect, refuel, or wipe the parts. If any faults are found during operation, the crane must be stopped immediately.

    When the work is terminated, the overhead crane should be parked on the parking line, the hook should be lifted into place, and heavy objects should not be hung on the hook. Place all controllers and control levers in the zero position, pull off the power switch, and lock the cab door.

    4. Bridge cranes must be equipped with reliable and sensitive devices. Generally, there are buffers, limiters (travel limiters, lifting limiters), lifting limiters, windproof rail clamps, etc.

    5. The casing of all live parts of the crane should be reliably grounded to prevent accidental electric shock accidents for operators. When the trolley track is not welded to the main beam, welding grounding should also be adopted, and the transformer should be grounded on the low voltage side according to regulations.

    We have introduced so many precautions for the use of bridge cranes. If you still have any questions or want to know more, you can continue to follow our website or contact our online customer service. We are dedicated to serving you.

    Precautions for using bridge crane

    Precautions for using bridge crane 2020-5-14 This article has been read 469 times
    Previous:The impact of excessive crane noiseNext:What are the maintenance methods for bridge cranes


    Service Hotline

    13615481234

    Contact: Manager Wu

    13615481234 (same WeChat account)

    Q  Q:2824483966

    Phone: 0538-7431089

    Email: gm@honfucrane.com

    website: www.qldzg.com

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more

    about product information

    Copyright ©: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information鲁ICP备16026539号-7