Many projects rely on crane equipment during implementation, so it is necessary to install a crane equipment. So we will introduce to you what to pay attention to when installing crane equipment.
1. Check the model, specifications, and quantity of equipment, materials, and accessories according to the packing list of single beam crane equipment, and ensure that they meet the requirements of the design and equipment technical documents. They should also have a factory certificate of conformity and necessary factory test records.
2. Mechanical and electrical equipment should be free of deformation, damage, and rust, and steel wire ropes should not have rust, damage, bending, looping, twisting, cracking, or looseness.
3. The technical documents of the equipment should be complete;
4. The coordinate position, elevation, span, and surface flatness of the suspension rail should meet the design and installation requirements.
5. Before hoisting, the electric single beam suspension crane should be rechecked according to the provisions in the table below. After being erected on the track, the gap between the inner side of the wheel flange and the flange of the I-beam track should be 3-5mm
The above is the content introduced to us by the Shandong bridge crane manufacturer in this issue, hoping to be helpful to everyone.

| Previous:How to maintain and clean the crane | Next:What are the maintenance methods for bridge cranes |