         Before using a crane, there is a step to go through, which is to set up the crane. There are certain techniques for setting up a crane. In this issue, Shandong Qilide Heavy Industry Group Co., Ltd. will introduce the correct method for setting up a crane.

    1. Set the mast in the middle of the main beam of the crane, slightly close to the heavier side of the main beam, so that the lifting equipment will not tilt, and firmly tie the electric hoist to the main beam while lifting.

    2. When lifting, it should be kept steadily rising and not swayed arbitrarily. To enable control, ropes can be tied at both ends of the equipment.

    3. Use a winch and mast to thread the rope into the lifting hole for lifting.

    4. Lift the equipment to an appropriate height, fix the control room to the connecting frame and the connecting seat with bolts, and then weld the connecting seats to the main beam and the crossbeam according to the random drawings.

    5. When lifting the equipment beyond the track, pull the rope to twist and gradually lower it so that the crane's wheel groove aligns with the track and slowly descends.

    The above is all the content we have introduced to you in this issue, hoping to be helpful to you. If you want to learn more, then keep following our website.

    The correct method for setting up a crane

    The correct method for setting up a crane 2020-10-29 This article has been read 406 times
    Previous:How to prevent wear and tear of a single beam crane?Next:What are the maintenance methods for bridge cranes


    Service Hotline

    13615481234

    Contact: Manager Wu

    13615481234 (same WeChat account)

    Q  Q:2824483966

    Phone: 0538-7431089

    Email: gm@honfucrane.com

    website: www.qldzg.com

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more

    about product information

    Copyright ©: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information鲁ICP备16026539号-7