Before installing the equipment, the installation plan should be determined based on the machine equipment to be installed on site, and installation technical measures should be formulated; And conduct safety and security technical briefings for installation workers.
2. The installation site should be leveled and hardened, with smooth access to the road surface and no obstacles on top to reach the crane Transportation vehicles entering the site and lifting regulations.
3. The basic railway tracks and crane supports should meet the load requirements.
4. Safety warning lines should be laid out near the installation site of the lifting machine, and necessary safety warning signs and labels should be set up.
Before starting the installation work, it is necessary to check the downloaded devices and required raw materials, and the installation must be carried out in the order determined by the installation plan.
6. High strength bolts required for installation Stainless steel plates and steel pipes must have a certificate of conformity and be sampled for follow-up visits, which should comply with the design requirements; The torque wrench used for installation and other construction machinery must be systematically tested and meet the requirements before they can be used.
7. The tightening surface of high-strength bolts must be cleaned and free of oil stains Corrosion, etc.
8. Under the premise of the lifting capacity of the gantry crane, try to expand the road surface assembly work and reduce high-altitude work as much as possible.
Before lifting prefabricated components, a trial lift should be conducted to check the load-bearing capacity of each position. Only after everything is normal can they be lifted again.
10. Install semi-circular edge wrapping (galvanized steel wire rope corner protector) at the corners of the hoisting galvanized steel wire rope and machine equipment to prevent damage to the galvanized steel wire rope.
When the foot is temporarily placed upright, the bottom end of the vehicle should be fixed to prevent movement. The layout of wind ropes should be reliable Adequate quantity.
During the installation of the beam lifting machine, when the worker is working on the high-altitude prefabricated components, it is necessary to ensure that the support points of the prefabricated components are tightened firmly and take protective measures according to the relevant technical standards for high-altitude work.

| Previous:Precautions for operating a double beam crane | Next:What are the maintenance methods for bridge cranes |