• Precautions for operating electric hoist gantry crane

    Precautions for operating electric hoist gantry crane

    13615481234

    Business nature: production-oriented

    Contact: Manager Wu

    Phone:0538-7431089

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more about product information

    Product Company Profile Location

    Information Details

    Precautions for operating electric hoist gantry crane


    In order to achieve the desired operational effect when using electric hoist gantry cranes, it is necessary to follow certain operational guidelines. As a manufacturer of cranes with many years of experience, Shandong Longmen Crane Manufacturer has its own expertise in this area. Below, Shandong Longmen Crane Manufacturer will share with you the key points to consider when operating electric hoist gantry cranes.

    Before using an electric hoist, it is necessary to inspect both the mechanical and electrical components of the equipment. The steel wire rope, lifting hook, limiter, etc. should be in good condition, the electrical part should be free of leakage, and the grounding device should be in good working order.

    2. When starting to lift heavy objects, the operation should be stopped when the load is 100mm off the ground to check the braking condition of the electric hoist. Only after confirming that it is in good condition can the operation be officially carried out. During outdoor operations, a rainproof shed should be set up.

    3. If any abnormalities such as abnormal odor or high temperature occur during the operation of the electric hoist, it should be stopped immediately for inspection, and can only be used again after the fault is eliminated.

    4. When using a hanging cable electrical control switch, the insulation should be good and the sliding should be smooth. There should be a 2m open space behind the person's standing position, and the electrical button should be operated correctly.

    5. During lifting, if the load loses control and slides due to a malfunction, emergency measures must be taken to lower the load to an unoccupied area. Rapid descent is not allowed during lifting.

    After completing the task, the equipment should be parked at the designated location, the lifting hook raised, the power supply cut off, and the switch box locked.


    Shandong gantry crane manufacturer


    Precautions for operating electric hoist gantry crane 2026-3-27 This article has been read 31 times
    Previous:Key points for attention when using a single-beam craneNext:What are the maintenance methods for bridge cranes


    Service Hotline

    13615481234

    Contact: Manager Wu

    13615481234 (same WeChat account)

    Q  Q:2824483966

    Phone: 0538-7431089

    Email: gm@honfucrane.com

    website: www.qldzg.com

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more

    about product information

    Copyright ©: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information鲁ICP备16026539号-7